Hibernia Solar Project

Sector: Developing Renewable Energy Area of Expertise: Grid Connected Solar

Hibernia Solar Project

Camco has developed a 5MW solar project for the Renewable Energy Independent Power Producer Procurement Programme (REIPP)

The Hibernia project has best in class characteristics:

  • Very low connection costs: adjacent to an existing substation
  • World class solar resource: 2472 kWh/m2
  • Co-Developer: MW1
  • High Internal Rate of Return
  • Low development costs
  • Competitive construction costs
  • Timeline: 
    - Stage 1: March 2014 (successful) 
    - Stage 2: November 2014 (estimated) 
    - Financial close: June 2015 
    - Construction start: Sept 2015